Our Work

Real projects across Sacramento backyards. Tap a filter to find what you like.

0 Photos
500+ Projects Per Year
C27, C35, C53 Licensed

Before & After

Drag the handle on each photo to see the transformation. Real Sacramento-area projects.

Finished freeform pool with stamped concrete deck and clear blue water
Backyard before new pool installation — dirt and rebar shell during construction
Before After
Featured Build · Roseville, CA

A Backyard Built From the Ground Up

A bare lot turned into a full backyard escape. We engineered a freeform gunite pool with a tanning ledge, wrapped it in stamped concrete decking, and added the things you don't see — a structural retaining wall, solar heating, and a complete equipment pad. Designed to feel resort-quiet from the first dive to the last evening swim.

Total Investment $99,750 includes retaining wall, solar heating & full deck
Timeline 8 weeks
  • Freeform gunite pool
  • Tanning ledge
  • Stamped concrete deck
  • Retaining wall
  • Solar heating
  • LED lighting
Finished pool with new plaster, tile, deck and fence in Sacramento Fab 40s neighborhood
Empty drained pool with old spa and dirt yard before total backyard reset
Before After
Total Reset · Fab 40s, Sacramento

From Dirt to Done

A worn-out pool, a dated spa, and a dirt yard rebuilt into a finished backyard from the dirt up. New plaster and tile, fresh concrete deck, full plumbing and equipment, custom fence and gates, and brand new grass, drainage, and irrigation. One crew, one timeline, one flat price.

Total Investment $40,000 flat — full backyard reset
Scope Whole yard
  • New plaster
  • New tile
  • Pump & filter
  • Concrete deck
  • New plumbing
  • Custom gates & fence
  • Tree service
  • Landscape rocks
  • Drainage & irrigation
  • New grass
  • Spa removal
Same pool after renovation with fresh gray plaster and new stacked stone wall
Drained pool with worn green tile waterline before renovation
Before After

Pool Renovation

New gray quartz plaster, fresh waterline tile, and a clean stacked-stone feature wall replacing the dated rock work. Same shape, brand-new feel.

Investment $25,000
Timeline 3 weeks
Same pool with new stamped marble decking and clear blue water
Pool with old red brick deck and green water before remodel
Before After

Deck & Pool Remodel

Tired red-brick deck and green water swapped for stamped marble-finish concrete and a fresh plaster surface. Whole backyard reset.

Investment $28,000
Timeline 4 weeks
Same pool with fresh plaster, new step ledge, and rail after remodel
Pool with worn plaster and faded mosaic band before remodel
Before After

Plaster Remodel

Worn plaster and a tired mosaic band replaced with new plaster, a built-in step ledge, and a fresh handrail for easy in-and-out.

Investment $12,000
Timeline 2 weeks
Same pool with fresh smooth gray plaster after replaster
Crew chipping out old worn blue plaster from pool before replaster
Before After

Replaster

Old blue plaster chipped out, surface prepped, and a fresh smooth gray plaster troweled in. Cleanest budget refresh you can do.

Investment $8,500
Timeline 1 week